Check shower stud walls.
How do i tile a shower wall.
You ll need a design plan before you start attaching the tile.
Do this vertically horizontally and diagonally.
Measure each wall area calculating the width times height.
In our project we brought an old 70s bathroom into classic art deco style.
To start tiling prepare by running a bead of silicone caulk around the perimeter of the area you are tiling to.
Determine how much tile you ll need.
Start by turning off the water to the shower so you don t accidentally ruin your work.
Add up the wall areas and add 10 so you have extra tile for mistakes or future repairs.
Find and mark the center point on the wall and draw a plumb line as a reference mark.
If the studs aren t plumb and level the waterproofing won t be either.
Preparing the shower for tiles 1.
Do not put down.
You should get the shower wall down to the bare studs.
Unless you plan to replace the shower pan too leave it in place.
Put up a sturdy cement.
Measure up 13 the height of one row of tiles plus the grout line and draw a level line.
Take a 4 foot level and place it across all the studs.
Draw a leveled line where the bottom of the second row will fall.
Begin the bathroom tile installation with the second row up from the bottom.
This will provide a straight edge for the tile to.
In order to prevent moisture.
If the shower base is uneven tiles will.
Rip out any old tile drywall or surrounds that were on the wall.
Gut the shower stall down to the studs.
For our shower we chose a running bond pattern.
How to tile bathroom walls and shower tub area step 1.
You may need to remove the shower pan and ceiling as well.
Choose a vapor barrier to install and introduce according to manufacturer directions.
These two lines will guide the initial tile installation.